Logo
Gemstar Resources
Open red-earth country and scrub on the Menzies lease

Gemstar/Why Invest?

A Rare Investment Opportunity

Australia’s first emerald-focused IPO, positioning Gemstar as a unique asset in the resources sector.

01A first for the ASX

A new Australian source in a concentrated market

Gemstar holds 100% of Australia Menzies Emerald Pty Ltd (Mining Lease M30/8). This ensures complete operational independence and strategic flexibility as we move towards production.

Where emeralds are mined today● Producing regions● Menzies Emerald Project
ColombiaBrazilZambiaZimbabweEthiopiaMadagascarCentral AsiaRussiaMenzies, Western Australia

Highly concentrated supply

Colombia, Zambia and Brazil.

Premium anchored by Colombia

Zambia supplies stable mid-high quality.

Fastest demand growth

China & India; EU/US maisons & auctions set top-end pricing.

Producing regions from the Global Production Reference. Source: Indicative industry estimates compiled from publicly available gemstone market studies and trade references.
1stUnique Equity Story

Australia’s first emerald-focused IPO, positioning Gemstar as a unique asset in the resources sector.

100%100% Ownership

Full control of the Menzies Emerald Project through AME, ensuring streamlined decision-making.

M30/8Proven Geology

Granted mining lease with existing infrastructure and historical workings confirming high-grade mineralisation.

A cut emerald held in tweezers

02The stone

Product Focus

We target high-value 1–5 ct mid-to-high quality emeralds. Our strategy involves precise sorting and potential future branding to unlock premium pricing in the global color stone market.

Value Stack Structure

The price of an emerald is primarily built on its "value stack," where color dominates. The most prized stones exhibit a vivid, saturated green hue.

03The deposit

Historic Grounds, Untapped Potential

Local geology comprises a metamorphosed mafic–ultramafic sequence, including an ultramafic zone approximately 120 m wide, intruded by pegmatite dykes. Historical mapping identified seven shoots in the south-central part of the Mining Lease, with more recent exploration and trial mining finding additional mica schist shoots in the north-central parts.

0 m10 m20 m30 m40 mWestEast Ultramafic host rockWeathered layer Mica schistPegmatite ~35 mRotary percussion holes Shoots 20–35 m~65°
Schematic cross-section, not to scale for rock contacts. Dip and depth from the 1980 drilling as summarised in the Independent Technical Report.

Source: Investor Presentation, extracted from the Independent Technical Report prepared by Grant Boxer.

Historical Significance
134ctLargest Recorded Stone
325ct/tPeak Historical Grade (1994-1996)

* Historical data for context only. Not a JORC resource.

05Path to listing

Where we are, and what happens next

Phase 1: Pre-IPO & IPOIn progress
  1. CompleteCompany restructure
  2. CompleteCornerstone investor secured
  3. Next · Nov 2026ASX in-principle advice
  4. Q1 2027Prospectus lodgement
  5. Target · Mar 2027ASX listing

Indicative timing, subject to ASX approval

Phase 2: Execution

Operational readiness and initial production ramp-up.

Site Infrastructure ReactivationProcessing Facility CommissioningInitial Staged Production
Phase 3: Expansion

Resource expansion and market penetration.

Follow-up DrillingDownstream Sales ChannelsBrand Partnerships